Hospital Retrofit & Advisory
Your hospital has to keep running while it changes. We help owners, operators and buyers plan, approve and deliver retrofits, expansions and upgrades in live hospitals. One transdisciplinary team covers medical planning, architecture, interior design and landscape architecture, from the practice behind IJN and Cyberjaya Hospital.
Architects of Gleneagles Hospital Kuala Lumpur’s Block B, and retrofitting Gleneagles and Fatimah Hospital, Ipoh, since 2023. More hospitals approach us every month.
The problem
A new hospital starts on an empty site. An existing one has patients in the beds, theatres booked, an accreditation to keep and a licence that depends on what you change. Every decision touches clinical operations, infection control, Ministry of Health approval and the budget at once.
Private healthcare never stands still. New specialists arrive, services are added, medical technology changes and patient expectations rise, and the building has to keep up. We understand that private hospitals need their existing buildings to change to suit operational realities, and we plan every retrofit around how your hospital actually runs.
That is why hospital retrofit needs a transdisciplinary team: medical planners, architects, interior designers and landscape architects who understand how hospitals run, not just how they are built.
Our services
01
Before you commit capital, we work out what your hospital should become and how to get there. We review your clinical services, bed mix, departmental adjacencies, ageing infrastructure and accreditation gaps, then set out a phased plan for renovation or expansion that keeps the hospital operating. This includes adding beds or a new wing, reconfiguring wards for single rooms, and upgrading the patient experience for local and international patients.
02
When a retrofit grows into an expansion, such as a new wing, additional floors or more beds, it often needs planning permission from the local authority before building plans can be approved. Our sister company, PAB Planners Sdn Bhd, prepares and manages these town planning applications, so planning, design and Ministry of Health submissions move forward together under one team.
03
We design and deliver upgrades with clinical operations running around them:
Every project is phased around patient flow, with infection control measures during construction agreed with your infection control team, and submissions for Ministry of Health approval under the Private Healthcare Facilities and Services Act 1998 (Act 586) where the works require it.
04
Buying a hospital means buying its building, its licence position and its hidden costs. We inspect the facility and assess its condition, compliance and capacity to grow: building fabric, functional layout, approvals and licensing records, accreditation readiness, energy performance and expansion potential. You get a clear report on risks, likely capital expenditure and what the hospital can realistically become.
05
Hospitals run 24 hours a day, and energy is one of their largest operating costs. A hospital that uses 21,600 GJ or more of energy in 12 months (about 6 million kWh) is an energy consumer under the Energy Efficiency and Conservation Act 2024. Suruhanjaya Tenaga issues a written notice, and the hospital must then appoint a Registered Energy Manager, run an energy management system, report regularly and carry out energy audits.
We work alongside your Registered Energy Manager and energy auditor to design and deliver the architectural side of energy improvements: façade and glazing, shading, roofs, daylighting and space planning. Where your campus includes an office block or medical office building of 8,000 m² or more, we also certify its Gross Floor Area for the Energy Intensity Label. EECA Compliance & Energy Retrofit →
06
The way a project is tendered often decides its cost and quality more than the design does. We help you choose the right procurement route, whether conventional, design and build or packaged works for a live hospital. We prepare tender documents that protect clinical requirements, and evaluate bids on technical merit as well as price.
Ongoing advice
Ongoing access to our transdisciplinary team of medical planners, architects, interior designers and landscape architects, for operators who need regular, expert advice without commissioning a full project each time.
Use it for:
FROM
RM8,000
per month
10 hours of consultancy each month
Unused hours do not roll over to the next month.
Why PAB
We completed Block B of Gleneagles Hospital Kuala Lumpur, and have since returned to retrofit its floors as the hospital’s needs change over time. We have also been retrofitting Fatimah Hospital, Ipoh, since 2023. Works in both hospitals are carried out while they stay open.
PAB designed the National Heart Institute (IJN), completed in 1992, the first hospital fully designed by a Malaysian health facility planning team.
Cyberjaya Hospital is Malaysia’s first GBI Platinum hospital and won National Energy Awards in 2026. Gleneagles Hospital Kuala Lumpur was Malaysia’s first GBI Gold hospital, in 2016.
Medical planning, architecture, interior design and landscape architecture under one roof, working as one transdisciplinary team. Clinical workflow, building, interiors and outdoor spaces are planned together, so you have one team and one point of accountability instead of separate consultants to coordinate. Where an expansion needs planning permission, our sister company PAB Planners Sdn Bhd handles the town planning approvals.
Yes. Most of our hospital work happens in live hospitals. We phase the works around patient flow, separate construction zones from clinical areas, and agree infection control measures with your infection control team before work starts.
Many do. Private hospitals are licensed under the Private Healthcare Facilities and Services Act 1998 (Act 586), and alterations that affect the licensed facility may need approval. We assess what your works require and prepare the submissions.
Usually, yes. Adding a wing, floors or beds generally needs planning permission from the local authority before building plans are approved. PAB Planners Sdn Bhd, our town planning company, prepares and manages these applications alongside the design and Ministry of Health submissions.
A hospital that uses 21,600 GJ or more of energy in 12 months is an energy consumer under EECA 2024 and receives a written notice from Suruhanjaya Tenaga. The Energy Intensity Label for buildings currently applies to office buildings, which may include an office block on a hospital campus.
The building's condition, functional layout, approvals and licensing records, accreditation readiness, energy performance and expansion potential, with an estimate of the capital expenditure each issue is likely to need.
The retainer starts at RM8,000 per month for 10 hours of consultancy with our transdisciplinary team of medical planners, architects, interior designers and landscape architects. Unused hours do not roll over to the next month.
Yes. We can lead the team, or advise alongside your existing engineers, quantity surveyors and contractors.
Enquiry
Share a few details about your hospital and what you are planning, and we will advise on the next step.
We will contact you within the next working day.
PAB Architecture Sdn Bhd
Suite 7.03, Level 7, JKG Tower
282, Jln Raja Laut, 50350 Kuala Lumpur.